LogoVEIN
Alpine Vanadium Operation · Est. 2019
46.8°N 12.1°E2,140m ASL

What comes out of
this ground
holds cities together.

High-purity V₂O₅ from certified alpine seams — supplied to steel mills, VRFB battery manufacturers, and aerospace alloy houses on traceable, contract-grade terms.

Live Procurement Estimator

Indicative pricing from current production schedule · Updated Feb 2026

250 mt
10 mt500 mt1,000 mt
Indicative Price Band (USD/mt V₂O₅)

FOB bonded warehouse, subject to final assay

Lead Time

From current schedule

Supply Reliability

Non-binding. A procurement specialist responds within 1 business day.

JORC 2012 Reserve Statement
ISO 9001 · ISO 14001
REACH Registered
SGS-certified assays
Rail-connected · Port of Trieste
01 / Geology

What the mountain
holds.

JORC-compliant reserve statement, third-party assay certificates, and drill core logs. Every number is a document.

4.2 Mt
Indicated Reserve
V₂O₅ ore body
2.3%
Avg. Grade
V₂O₅ by weight
34 yrs
Mine Life
at current extraction rate
JORC
Cert. Body
2012 Code compliant

Core Sample Assay Data — Seam VN-Alpha

SGS Laboratories · Certificate batch 2024-VN · ISO 17025 accredited

3 of 4 certified
Core IDDepthV₂O₅ %Fe %SiO₂ %StatusCertificate
VN-2024-C01142–198m1.84%18.2%42.1% Certified
VN-2024-C02198–261m2.31%19.8%38.7% Certified
VN-2024-C03261–340m2.67%21.3%35.9% Certified
VN-2024-C04340–410m2.44%20.1%37.2% Pending

Full Reserve Report — 2024 Edition

JORC-compliant resource statement, geological maps, drill collar coordinates. 48pp PDF.

02 / Extraction

Hydrometallurgical
flowsheet.

Every reagent named. Every recovery percentage measured. No black boxes between ore and flake.

1
PHASE 01

Crushing & Grinding

Run-of-mine ore reduced to P80 75µm in a SAG/ball mill circuit

Feed grade: 2.1–2.7% V₂O₅

2
PHASE 0291% recovery

Roast Leach

Salt-roast at 850°C converts vanadium spinel to water-soluble sodium vanadate

Reagents:NaCl (salt)Na₂SO₄ (sodium sulphate)

Roast atmosphere: oxidising

3
PHASE 0396% recovery

Water Leach & Clarification

Counter-current decantation extracts sodium vanadate into aqueous solution

Reagents:H₂O (process water)Flocculant (anionic polyacrylamide)

pH controlled 7.5–8.5

4
PHASE 0498% recovery

Solvent Extraction

Selective SX removes impurities; vanadium stripped into NH₄ solution

Reagents:Alamine 336 (tertiary amine)Kerosene (diluent)H₂SO₄ (strip acid)

Fe, Si, P rejection >99%

5
PHASE 0599.2% recovery

Precipitation & Calcination

Ammonium metavanadate precipitated, filtered, calcined at 550°C to V₂O₅ flake

Reagents:NH₄OH (ammonium hydroxide)NH₄HCO₃ (ammonium bicarbonate)

Final product: 98–99.9% V₂O₅ flake

Final Product
V₂O₅ Flake
98.0% · 99.5% · 99.9% purity grades
Overall circuit recovery: 84.6% V from ore
03 / Quality

Every shipment
certifiable.

ISO, REACH, and laboratory accreditation documents available for inline preview. Third-party certificates ship with every consignment.

Product Specification — V₂O₅ Flake

All values are guaranteed minimums/maximums. Certificate of Analysis supplied per lot.

Parameter98.0% Grade99.5% Grade99.9% Grade
V₂O₅ content (min)98.0%99.5%99.9%
Fe (max)0.30%0.15%0.05%
SiO₂ (max)0.50%0.20%0.08%
P (max)0.020%0.010%0.005%
S (max)0.050%0.020%0.008%
Particle size (D90)≤3.0mm≤2.5mm≤1.5mm
Moisture (max)0.5%0.3%0.2%
ISO 9001:2015Valid: Dec 2026

Quality Management System

Mining, processing, and dispatch of V₂O₅ flake

Issued by: Bureau Veritas

18pp
ISO 14001:2015Valid: Mar 2027

Environmental Management

Site operations, water management, tailings

Issued by: SGS

24pp
REACH Reg. (EC) 1907/2006Valid: Perpetual

Chemical Safety — EU Compliance

V₂O₅ substance registration, SDS package

Issued by: Chemservice GmbH

42pp
ISO 17025:2017Valid: Oct 2026

Laboratory Accreditation

On-site assay laboratory, XRF, ICP-OES

Issued by: NATA (Cert. #18412)

11pp
04 / Logistics

Mine mouth
to your yard.

Rail-connected mine with bonded warehouse in Rotterdam. Continuous chain of custody from seam to delivery.

Supply Chain Route
Alpine Mine → Rail SidingR1
Road34 kmTransit: 45 minCarrier: Vein fleet
Rail Siding → Port of TriesteR2
Rail312 kmTransit: 6–8 hrsCarrier: ÖBB / RFI intermodal
Port of Trieste → Global PortsR3
SeaVariableTransit: 14–28 daysCarrier: MSC / CMA CGM
Bonded Warehouse (Rotterdam)R4
StorageTransit: Up to 90 daysCarrier: Vein-bonded facility

Delivery Specifications

Packaging
1,000 kg big bags (UN-rated) or 200 kg steel drums
Incoterms
EXW, FCA, CPT, CIF available
Documentation
COA, MSDS, packing list, phytosanitary, certificate of origin
Inspection
SGS or Intertek at port of loading — buyer option
Payment
L/C at sight, T/T 30 days (approved buyers)

Current Shipping Schedule

Mar 2026Committed180 mt
Apr 2026Committed220 mt
May 2026Available∼200 mt
Jun 2026Available∼240 mt
Q3 2026Planning∼700 mt

Spot availability updated monthly. Contact for precise allocation.

05 / Community

The valley
stays clean.

Water table data, employment figures, and reclamation photography — live and downloadable. ESG due diligence starts here.

Water Table Monitoring Dashboard

Continuous monitoring · 4 stations · Updated 26 Feb 2026 06:00 UTC

All clear
Monitoring PointV ReadingRegulatory LimitStatus
WM-01 (Upper seam)0.003 mg/L V0.1 mg/L✓ Within limits
WM-02 (Process pond)0.041 mg/L V0.1 mg/L✓ Within limits
WM-03 (Valley stream)0.002 mg/L V0.05 mg/L✓ Within limits
WM-04 (Downstream)< 0.001 mg/L V0.05 mg/L✓ Within limits

Local Employment — 2025 Figures

0
Direct mine jobs
0
% local hires (canton)
0
Contractor roles
0%
Avg. wage vs. regional median

Progressive Reclamation Programme

Continuous rehabilitation · photography archive available

2021
Alpine meadow restoration
2.4 ha
Complete
2022
Riparian buffer replanting
1.8 ha
Complete
2023
Conifer nursery establishment
3.1 ha
Complete
2024–25
Progressive pit rehabilitation
4.2 ha
Active

Ready to put
vanadium on your schedule?

Use the estimator above to configure your requirements, then request formal supply terms. Our procurement team responds within one business day.